Pre-Construction Termite Barriers
Physical termite barriers built into your slab as you go up — sheet membranes, stainless mesh and penetration collars installed to AS 3660.1 — get a free quote online in 60 seconds. No phone calls, no waiting on a quote.
No phone calls. No fuss. Get a precon barrier quote in 60 seconds. Built protected.
Prefer to talk? 1800 299 478
What Our Customers Say
Real reviews from real customers across Sydney
Ready Set Spray's Pre-Construction Termite Barriers
A physical termite barrier is built into the structure, not sprayed around it. Installed while the slab is still going down, it blocks the concealed paths termites use to get from the soil into your framing — up through construction joints, around plumbing penetrations and behind the perimeter edge — and forces any activity out into the open where an inspection will find it.
Because it's a physical system rather than a chemical one, it doesn't rely on a termiticide staying in the soil, and it doesn't need re-treating on a chemical's timetable. New dwellings in NSW need a termite management system to AS 3660.1, and a physical barrier is the option most certifiers and councils are happiest to sign off on.
The other reason to do it now is cost. Laying membrane and collars on an open slab bed is a fraction of the work of retrofitting protection to a finished building, where the same coverage means trenching, drilling and patching around everything that has since been built on top. On a new build or an extension, the cheapest termite protection you will ever buy is the one that goes in before the pour.
We install under-slab sheet membranes, perimeter and cavity systems at the slab edge, collars around every pipe and conduit that comes through the slab, and joint protection wherever the concrete is poured in stages.
Barrier Systems We Install
Sheet Membrane Systems
Termite-resistant sheeting laid under the slab and up the perimeter before the pour, lapped and sealed so there's no concealed route from the soil into the building. It goes down with the vapour barrier and adds no time to your program.
Stainless-Steel Mesh
Marine-grade woven mesh with an aperture too fine for termites to pass through and too tough for them to chew. Used at slab edges, penetrations and cavity lines where a durable, permanent physical block is needed.
Penetration Collars
Every pipe, conduit and service that comes up through the slab gets a collar sealed to both the penetration and the barrier. Unsealed penetrations are the single most common way termites get into an otherwise well-protected new home.
Construction Joint Protection
Where concrete is poured in stages, the cold joint between pours is a ready-made gap. We run barrier material through those joints and around control joints so the finished slab reads as one continuous protected surface.
What's Included in Your Pre-Construction Barrier
Site Plan Review & Barrier Design
We work from your slab and hydraulic drawings to design the system, count penetrations and identify joints before anyone is on site
AS 3660.1-Compliant Installation
Installed by licensed technicians to the Australian Standard for termite management in new building work, to the system manufacturer's specification
Coordination With Your Pour
We book around your slab pour date and work in with your concreter and plumber, so the barrier never becomes the reason a pour slips
Certificate of Installation
Documentation of the system, materials and areas treated, issued in the form your certifier needs for occupation certificate sign-off
Durable Notice Placement
The permanent notice recording the system installed and the next inspection date, fixed in the meter box as the Standard requires
Final Inspection
A check of the completed barrier before it's covered, confirming laps, collars and joints are intact after other trades have been through
The Ready Set Spray Expert Process
Free Quote From Your Plans
Send through the slab and hydraulic drawings. We take off the areas, penetrations and joints and come back with a fixed written price — no charge, no obligation.
Pre-Pour Installation
Membrane, mesh and collars go in once the plumbing is roughed in and before the steel is signed off, timed so the concreter pours on schedule.
Post-Pour Perimeter & Penetrations
After the pour we complete the slab-edge and cavity work and seal any penetrations added later, closing the system around the whole footprint.
Certificate & Handover
Final inspection, then your certificate of installation and durable notice — the paperwork your certifier asks for at occupation certificate stage.
Why Builders Use Us for Pre-Construction
We Work to Your Program
Barrier install is booked against your pour date and we turn up when we say we will. A termite barrier should never be the trade that holds up a slab.
Licensed Installers
Licensed, insured technicians installing to AS 3660.1 and to the system manufacturer's specification — the two things a certifier will check.
Certifier-Ready Paperwork
Certificate of installation and durable notice issued on completion, in the format your private certifier or council expects to receive.
Priced Off the Drawings
We quote from your plans with penetrations counted, so the number you carry in your budget is the number you get invoiced.
Volume & Multi-Lot Work
Set up once and we'll run the same system across every lot in your development, with one point of contact and consistent documentation.
Permanent Protection
A physical barrier is part of the building. There's no chemical to deplete — it keeps doing its job as long as it isn't breached by later work.
Build the Protection In
Send us your plans and get a free pre-construction barrier quote in just a few clicks.
- Free Quote From Your Drawings
- Installed to AS 3660.1
- Booked Around Your Slab Pour
- Certifier-Ready Documentation

